Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 2672 | Paper Coated And Laminated, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0493 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $516 | $1,000 | Implemented |
MA0493 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,165 | $3,750 | Not Implemented |
MA0493 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,613 | $150 | Implemented |
MA0493 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,846 | $0 | Implemented |
MA0493 # 01 Y:2001 | 01 | 2001 | ADOPT IN-HOUSE MATERIAL GENERATION | $48,702 | $180,000 | Not Implemented |
MA0493 # 06 Y:2001 | 06 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $161 | $100 | Implemented |
MA0493 # 07 Y:2001 | 07 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $350 | $0 | Implemented |
UD0626 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,326 | $1,000 | Implemented |
UD0626 # 01 Y:2001 | 01 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $49,350 | $4,680 | Not Implemented |
UD0626 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,653 | $0 | Implemented |
UD0626 # 04 Y:2001 | 04 | 2001 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,451 | $112 | Implemented |
UD0626 # 05 Y:2001 | 05 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,173 | $364 | Implemented |
UD0626 # 06 Y:2001 | 06 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,158 | $1,050 | Implemented |
UD0626 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,847 | $42 | Implemented |
UD0626 # 08 Y:2001 | 08 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,587 | $423 | Implemented |
UD0626 # 09 Y:2001 | 09 | 2001 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $860 | $250 | Implemented |
UD0626 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $2,526 | Implemented |
UD0626 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $514 | $0 | Not Implemented |
IA0266 # 02 Y:2001 | 02 | 2001 | REDUCE VENTILATION AIR | $12,703 | $5,038 | Not Implemented |
IA0266 # 13 Y:2001 | 13 | 2001 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $231,300 | $0 | Implemented |
IA0266 # 01 Y:2001 | 01 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,215 | $35,700 | Not Implemented |
IA0266 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,737 | $0 | Implemented |
IA0266 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,175 | $11,846 | Implemented |
IA0266 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,933 | $0 | Not Implemented |
IA0266 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $2,034 | $1,663 | Implemented |