Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 2672 | Paper Coated And Laminated, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0032 # 02 Y:2008 | 02 | 2008 | REDUCE VENTILATION AIR | $19,700 | $1,200 | Implemented |
DL0032 # 03 Y:2008 | 03 | 2008 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $12,400 | $7,000 | Not Implemented |
DL0032 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,639 | $31,781 | Implemented |
DL0032 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,400 | $7,500 | Implemented |
DL0032 # 06 Y:2008 | 06 | 2008 | REPLACE BOILER | $6,100 | $6,100 | Implemented |
DL0032 # 07 Y:2008 | 07 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,521 | $643 | Implemented |
DL0032 # 08 Y:2008 | 08 | 2008 | USE MINIMUM STEAM OPERATING PRESSURE | $2,065 | $0 | Implemented |
DL0032 # 01 Y:2008 | 01 | 2008 | REPLACE BOILER | $30,400 | $55,000 | Not Implemented |
SD0405 # 05 Y:2008 | 05 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,660 | $4,270 | Implemented |
SD0405 # 09 Y:2008 | 09 | 2008 | INSTALL OCCUPANCY SENSORS | $606 | $256 | Implemented |
SD0405 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,411 | $3,110 | Not Implemented |
SD0405 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,436 | $3,324 | Not Implemented |
SD0405 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,270 | $4,650 | Not Implemented |
SD0405 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,507 | $900 | Implemented |
SD0405 # 03 Y:2008 | 03 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,824 | $22,665 | Implemented |
SD0405 # 02 Y:2008 | 02 | 2008 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $62,965 | $69,500 | Implemented |
SD0405 # 01 Y:2008 | 01 | 2008 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $117,665 | $1,117,600 | Implemented |
UF0408 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,980 | $15,208 | Not Implemented |
UF0408 # 02 Y:2008 | 02 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,404 | $870 | Implemented |
UF0408 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,339 | $1,246 | Implemented |
UF0408 # 04 Y:2008 | 04 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $187 | $0 | Not Implemented |
UF0408 # 05 Y:2008 | 05 | 2008 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,753 | $1,551 | Not Implemented |
UF0408 # 06 Y:2008 | 06 | 2008 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $44,425 | $3,443 | Not Implemented |
UF0408 # 07 Y:2008 | 07 | 2008 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $2,931 | $0 | Implemented |