IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

497

matching recommendations
Reset
SIC 2673 Bags: Plastics, Laminated, & Coated
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0118 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $957 $610 Implemented
IA0118 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,175 $485 Implemented
IA0118 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,004 $25 Not Implemented
IA0118 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,861 $12,260 Not Implemented
IA0118 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,388 $425 Not Implemented
IA0118 # 09 Y:1995 09 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,047 $2,700 Not Implemented
IA0118 # 10 Y:1995 10 1995 INSTALL OCCUPANCY SENSORS $487 $1,470 Not Implemented
IA0118 # 11 Y:1995 11 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $280 $50 Not Implemented
IA0118 # 12 Y:1995 12 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $237 $0 Implemented
IA0118 # 13 Y:1995 13 1995 USE A DIFFERENT OR RECYCLED RAW MATERIAL $38,410 $0 Implemented
CO0330 # 01 Y:1995 01 1995 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $10,040 $32,850 Not Implemented
CO0330 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,280 $12,700 Not Implemented
CO0330 # 03 Y:1995 03 1995 USE RADIANT HEATER FOR SPOT HEATING $3,470 $5,400 Not Implemented
CO0330 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,150 $6,720 Not Implemented
CO0330 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,470 $1,600 Implemented
CO0330 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,590 $1,940 Implemented
CO0330 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $520 $1,770 Not Implemented
AM0240 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,230 $0 Implemented
AM0240 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,860 $40 Implemented
AM0240 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,340 $1,570 Implemented
AM0240 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $870 $170 Implemented
AM0240 # 05 Y:1995 05 1995 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $780 $0 Implemented
AM0240 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $670 $835 Implemented
AM0240 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $1,960 Implemented
AM0240 # 08 Y:1995 08 1995 USE SYNTHETIC LUBRICANT $610 $0 Implemented