IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

497

matching recommendations
Reset
SIC 2673 Bags: Plastics, Laminated, & Coated
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0480 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,276 $9,045 Not Implemented
AS0480 # 01 Y:2020 01 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,992 $66,000 Implemented
TR0012 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $5,267 $1,049 Implemented
TR0012 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,120 $5,616 Implemented
TR0012 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,664 $6,310 Implemented
TR0012 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $296 Implemented
WV0570 # 08 Y:2019 08 2019 MINIMIZE WATER USAGE $2,057 $1,050 Not Implemented
WV0570 # 07 Y:2019 07 2019 INSULATE BARE EQUIPMENT $1,056 $247 Implemented
WV0570 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,692 $1,000 Implemented
WV0570 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $7,457 $30,875 Not Implemented
WV0570 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,976 $468 Implemented
WV0570 # 03 Y:2019 03 2019 DEVELOP A REPAIR/REPLACE POLICY $15,386 $868 Implemented
WV0570 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,683 $2,990 Implemented
WV0570 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $122,928 $148,200 Not Implemented
NC0611 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,179 $92,653 Implemented
NC0611 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,370 $200 Implemented
NC0611 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,064 $100 Not Implemented
NC0611 # 04 Y:2018 04 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,227 $35,000 Not Implemented
NC0611 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $2,887 $5,685 Implemented
NC0611 # 06 Y:2018 06 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,662 $200 Implemented
BD0477 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,854 $42,330 Not Implemented
BD0477 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $744 $2,450 Not Implemented
BD0477 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $800 Not Implemented
BD0477 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $1,000 Not Implemented
BD0477 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,507 $20 Not Implemented