IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 2673 Bags: Plastics, Laminated, & Coated
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0147 # 10 Y:2014 10 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,158 $250 Implemented
MZ0147 # 01 Y:2014 01 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $871 $360 Implemented
MZ0147 # 02 Y:2014 02 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 03 Y:2014 03 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 04 Y:2014 04 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $423 $470 Implemented
MZ0147 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,562 $42,645 Implemented
MZ0147 # 06 Y:2014 06 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,184 $600 Implemented
MZ0147 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $9,950 $5,290 Not Implemented
MZ0147 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $2,616 $2,613 Not Implemented
MZ0147 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,212 $420 Implemented
MO0217 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,125 $8,080 Implemented
MO0217 # 11 Y:1997 11 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $74,530 $10,000 Implemented
MO0217 # 10 Y:1997 10 1997 RECOVER WASTE HEAT FROM EQUIPMENT $82,412 $230,000 Not Implemented
MO0217 # 09 Y:1997 09 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,440 $1,048 Implemented
MO0217 # 08 Y:1997 08 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,458 $80 Implemented
MO0217 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,301 $116 Implemented
MO0217 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,151 $3,156 Implemented
MO0217 # 04 Y:1997 04 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $7,350 $12,500 Implemented
MO0217 # 03 Y:1997 03 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $8,200 $20,000 Implemented
MO0217 # 02 Y:1997 02 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,495 $3,500 Implemented
MO0217 # 01 Y:1997 01 1997 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $46,952 $50,000 Implemented
MO0113 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,931 $150 Not Implemented
MO0113 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,008 $5,100 Not Implemented
MO0113 # 02 Y:1994 02 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $405 $30 Not Implemented
MO0113 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,698 $10,623 Not Implemented