Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2673 | Bags: Plastics, Laminated, & Coated |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0025 # 02 Y:1992 | 02 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,071 | $1,072 | Implemented |
HO0025 # 03 Y:1992 | 03 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,322 | $800 | Implemented |
HO0025 # 04 Y:1992 | 04 | 1992 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $15,211 | $200 | Not Implemented |
HO0025 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $330 | $320 | Implemented |
KU0381 # 02 Y:1992 | 02 | 1992 | AIR CONDITION ONLY SPACE NECESSARY | $472 | $2,300 | Not Implemented |
KU0381 # 09 Y:1992 | 09 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $429 | $1,400 | Implemented |
KU0381 # 08 Y:1992 | 08 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $322 | $0 | Implemented |
KU0381 # 07 Y:1992 | 07 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $450 | $716 | Implemented |
KU0381 # 06 Y:1992 | 06 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $667 | $0 | Not Implemented |
KU0381 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $83 | $0 | Not Implemented |
KU0381 # 04 Y:1992 | 04 | 1992 | INSTALL SET-BACK TIMERS | $751 | $700 | Implemented |
KU0381 # 03 Y:1992 | 03 | 1992 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $150 | $30 | Implemented |
KU0381 # 01 Y:1992 | 01 | 1992 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,545 | $20 | Implemented |
KU0374 # 07 Y:1992 | 07 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $327 | $0 | Not Implemented |
KU0374 # 06 Y:1992 | 06 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $403 | $0 | Not Implemented |
KU0374 # 05 Y:1992 | 05 | 1992 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $602 | $1,066 | Implemented |
KU0374 # 04 Y:1992 | 04 | 1992 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,651 | $1,785 | Implemented |
KU0374 # 03 Y:1992 | 03 | 1992 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,925 | $4,800 | Not Implemented |
KU0374 # 02 Y:1992 | 02 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $2,477 | $0 | Implemented |
KU0374 # 01 Y:1992 | 01 | 1992 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,932 | $3,705 | Not Implemented |
RU0136 # 01 Y:1992 | 01 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,772 | $0 | Implemented |
RU0136 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,508 | $8,097 | Not Implemented |
RU0136 # 03 Y:1992 | 03 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $498 | $152 | Not Implemented |
RU0136 # 04 Y:1992 | 04 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,771 | $30 | Implemented |
RU0136 # 05 Y:1992 | 05 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,803 | $500 | Not Implemented |