Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 2674 | Bags: Uncoated Paper & Multiwall |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0192 # 10 Y:1986 | 10 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $237 | $0 | Not Implemented |
KU0192 # 09 Y:1986 | 09 | 1986 | INSULATE BARE EQUIPMENT | $261 | $300 | Implemented |
KU0192 # 08 Y:1986 | 08 | 1986 | INSULATE BARE EQUIPMENT | $293 | $200 | Implemented |
KU0192 # 07 Y:1986 | 07 | 1986 | IMPROVE LUBRICATION PRACTICES | $2,627 | $1,700 | Not Implemented |
KU0192 # 06 Y:1986 | 06 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,390 | $100 | Not Implemented |
KU0192 # 05 Y:1986 | 05 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $816 | $0 | Not Implemented |
KU0192 # 04 Y:1986 | 04 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,847 | $1,900 | Not Implemented |
KU0192 # 03 Y:1986 | 03 | 1986 | AIR CONDITION ONLY SPACE NECESSARY | $2,153 | $1,032 | Not Implemented |
KU0192 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,299 | $6,408 | Implemented |
KU0192 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,354 | $200 | Implemented |
KU0141 # 18 Y:1984 | 18 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $293 | $0 | Not Implemented |
KU0141 # 21 Y:1984 | 21 | 1984 | MINIMIZE WATER USAGE | $1,575 | $350 | Not Implemented |
KU0141 # 20 Y:1984 | 20 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $176 | $350 | Implemented |
KU0141 # 19 Y:1984 | 19 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $899 | $0 | Implemented |
KU0141 # 01 Y:1984 | 01 | 1984 | IMPROVE LUBRICATION PRACTICES | $11,187 | $600 | Implemented |
KU0141 # 17 Y:1984 | 17 | 1984 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $686 | $90 | Implemented |
KU0141 # 14 Y:1984 | 14 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,498 | $3,000 | Implemented |
KU0141 # 13 Y:1984 | 13 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $5,927 | $500 | Implemented |
KU0141 # 12 Y:1984 | 12 | 1984 | INSTALL SET-BACK TIMERS | $5,479 | $2,500 | Implemented |
KU0141 # 11 Y:1984 | 11 | 1984 | INSULATE BARE EQUIPMENT | $200 | $375 | Not Implemented |
KU0141 # 10 Y:1984 | 10 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $420 | $400 | Not Implemented |
KU0141 # 08 Y:1984 | 08 | 1984 | INSULATE BARE EQUIPMENT | $371 | $150 | Not Implemented |
KU0141 # 07 Y:1984 | 07 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $753 | $1,495 | Not Implemented |
KU0141 # 06 Y:1984 | 06 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,300 | $150 | Implemented |
KU0141 # 05 Y:1984 | 05 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,544 | $6,000 | Not Implemented |