IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

520

matching recommendations
Reset
SIC 2679 Converted Paper Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0363 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $419 $40 Implemented
SU0363 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $942 $156 Implemented
SU0363 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $245 $101 Implemented
SU0363 # 06 Y:2014 06 2014 ELIMINATE/REDUCE AN OPERATION $2,875 $3,456 Implemented
SU0363 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $293 $732 Implemented
SU0363 # 08 Y:2014 08 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $263 $810 Implemented
SU0363 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $682 $3,264 Implemented
DL0091 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,450 $39,400 Not Implemented
DL0091 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,180 $1,500 Not Implemented
DL0091 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,580 $2,500 Implemented
DL0091 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,770 $300 Implemented
DL0091 # 05 Y:2012 05 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,500 $16,000 Not Implemented
DL0091 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,830 $5,500 Not Implemented
DL0091 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $7,530 $100 Not Implemented
DL0091 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $890 $800 Not Implemented
DL0091 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,030 $300 Not Implemented
DL0091 # 10 Y:2012 10 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,810 $325 Not Implemented
CO0660 # 01 Y:2012 01 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $510 $3,090 Implemented
CO0660 # 02 Y:2012 02 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,610 $500 Implemented
CO0660 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,410 $3,310 Not Implemented
WM0003 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,254 $600 Implemented
WM0003 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,091 $0 Not Implemented
WM0003 # 03 Y:2012 03 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,223 $0 Not Implemented
WM0003 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $120 Implemented
WM0003 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $360 Implemented