IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0355 # 04 Y:2009 04 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,314 $500 Implemented
UM0355 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,008 $8,286 Implemented
UM0355 # 05 Y:2009 05 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $912 Implemented
UM0208 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,158 $100 Implemented
UM0208 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $484 $150 Implemented
UM0208 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,164 $650 Implemented
UM0208 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,036 $10,015 Implemented
ND0355 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,537 $345 Implemented
ND0355 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,602 $15,700 Implemented
ND0355 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,566 $300 Implemented
UM0154 # 01 Y:2000 01 2000 DISCONNECT BALLASTS $2,608 $880 Implemented
UM0154 # 04 Y:2000 04 2000 REDUCE VENTILATION AIR $18,794 $0 Implemented
UM0154 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,360 $0 Implemented
UM0101 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,749 $36,857 Implemented
UM0101 # 06 Y:1998 06 1998 $28,625 $2,800 Implemented
UM0101 # 05 Y:1998 05 1998 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $29,383 $3,166 Implemented
UM0101 # 04 Y:1998 04 1998 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $20,800 $200 Implemented
UM0101 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $3,067 $2,520 Implemented
ND0291 # 08 Y:1997 08 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $170 $0 Implemented
ND0291 # 10 Y:1997 10 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $99 $100 Implemented
ND0291 # 11 Y:1997 11 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $89 $20 Implemented
ND0291 # 06 Y:1997 06 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $287 $0 Implemented
ND0291 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,285 $348 Implemented
ND0291 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $1,350 Implemented
ND0291 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,825 $3,400 Implemented