Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0106 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,083 | $1,516 | Implemented |
DL0106 # 04 Y:2013 | 04 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $102,000 | $2,375,000 | Implemented |
DL0106 # 01 Y:2013 | 01 | 2013 | REDUCE VENTILATION AIR | $50,820 | $2,200 | Implemented |
LE0360 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,056 | $8,300 | Implemented |
LE0360 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,342 | $1,000 | Implemented |
LE0360 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $366 | $80 | Implemented |
LE0360 # 09 Y:2013 | 09 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $691 | $700 | Implemented |
LE0360 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,806 | $3,200 | Implemented |
LE0223 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $0 | Implemented |
LE0223 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $375 | $300 | Implemented |
LE0223 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $1,000 | Implemented |
LE0223 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $844 | $80 | Implemented |
LE0223 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,391 | $250 | Implemented |
LE0223 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,281 | $100 | Implemented |
LE0223 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,831 | $2,500 | Implemented |
LE0223 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,650 | $50 | Implemented |
LE0149 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $472 | $75 | Implemented |
LE0149 # 08 Y:2002 | 08 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $4,252 | $2,100 | Implemented |
LE0149 # 06 Y:2002 | 06 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $886 | $750 | Implemented |
LE0149 # 05 Y:2002 | 05 | 2002 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,578 | $25,000 | Implemented |
LE0149 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,547 | $1,200 | Implemented |
LE0149 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $1,441 | $260 | Implemented |
LE0149 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,182 | $1,000 | Implemented |
LE0149 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,655 | $340 | Implemented |
LE0104 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $393 | $550 | Implemented |