IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,640

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0115 # 06 Y:1997 06 1997 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS $129 $100 Not Implemented
AR0115 # 07 Y:1997 07 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $81,000 $51,950 Not Implemented
AR0115 # 08 Y:1997 08 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $116,819 $18,225 Implemented
AR0115 # 09 Y:1997 09 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $21,754 $0 Implemented
SF0115 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $492 $546 Not Implemented
SF0115 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $375 $763 Implemented
SF0115 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,601 $1,204 Not Implemented
SF0115 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $2,869 $525 Implemented
SF0115 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $712 $0 Implemented
SF0115 # 06 Y:1997 06 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $25,000 $250 Implemented
SF0115 # 07 Y:1997 07 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,025,000 $10,000 Not Implemented
UM0086 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,640 $7,640 Not Implemented
UM0086 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,988 $23,988 Implemented
UM0086 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $600 $600 Implemented
UM0086 # 04 Y:1997 04 1997 RECYCLE WASTE INK AND CLEANUP SOLVENT $1,270 $5,080 Not Implemented
UM0086 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $26,686 $1,500 Not Implemented
AS0201 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,343 $35 Not Implemented
AS0201 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,065 $960 Not Implemented
AS0201 # 03 Y:1997 03 1997 USE SYNTHETIC LUBRICANT $2,947 $935 Implemented
AS0201 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,756 $26,277 Not Implemented
AS0201 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,979 $34,500 Not Implemented
AS0201 # 06 Y:1997 06 1997 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $3,153 $1,070 Not Implemented
AS0201 # 07 Y:1997 07 1997 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $46,235 $14,000 Not Implemented
AS0201 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $2,188 $1,500 Not Implemented
AS0201 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $600 Not Implemented