IAC logo
IAC Assessment: BD0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1997
Principal Product Commercial Business Forms
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 132,400
Annual Production 20,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,876 3,110,492 kWh $0.03
Electricity Demand $62,530 7,940 kW-months/year $7.88
Electricity Fees $296 - $ -
Natural Gas $19,590 3,413 MMBtu $5.74
TOTAL ENERGY COSTS $196,822
RECOMMENDED SAVINGS* $21,398 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,898
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,125
Cost:
$1,500
- - - - $4,125 719 - - - - -
-
kWh
-
-
kW-months/year
$4,125
719
MMBtu
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,867
Cost:
$12,220
$2,291 65,944 $1,576 200 - - - - - - $2,291
65,944
kWh
$1,576
200
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,223
Cost:
$400
$1,521 43,962 $702 89 - - - - - - $1,521
43,962
kWh
$702
89
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,597
Cost:
$800
$1,112 31,946 $485 62 - - - - - - $1,112
31,946
kWh
$485
62
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,363
Cost:
$3,500
- - - - $1,363 237 - - - - -
-
kWh
-
-
kW-months/year
$1,363
237
MMBtu
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,177
Cost:
$2,086
$787 22,567 $390 50 - - - - - - $787
22,567
kWh
$390
50
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$301
Cost:
$400
- - - - - - $585 46,800 $(-284) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$585
46,800
lb
$(-284)
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$300
Cost:
$300
- - - - - - - - $300 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$300
-
$
09: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$6,445
Cost:
$8,600
- - - - - - - - $6,445 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$6,445
-
$
TOTAL RECOMMENDED Savings:
$21,398
Cost:
$29,806
$5,711 164,419 $3,153 401 $5,488 956 $585 46,800 $6,461 - $5,711
164,419
kWh
$3,153
401
kW-months/year
$5,488
956
MMBtu
$585
46,800
lb
$6,461
-
$
TOTAL IMPLEMENTED Savings:
$1,898
Cost:
$1,200
$1,112 31,946 $485 62 - - $585 46,800 $(-284) - $1,112
31,946
kWh
$485
62
kW-months/year
-
-
MMBtu
$585
46,800
lb
$(-284)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes