Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
224
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0071 # 05 Y:2015 | 05 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,537 | $0 | Implemented |
WM0071 # 04 Y:2015 | 04 | 2015 | USE SYNTHETIC LUBRICANT | $9,301 | $18,000 | Implemented |
WM0071 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,236 | $23,560 | Implemented |
WM0071 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,586 | $36,000 | Not Implemented |
WM0071 # 01 Y:2015 | 01 | 2015 | COMBINE UTILITY METERS | $104,990 | $300,000 | Not Implemented |
WM0024 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $287 | $0 | Implemented |
WM0024 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $519 | $974 | Not Implemented |
WM0024 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $950 | $550 | Implemented |
WM0024 # 03 Y:2013 | 03 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,156 | $0 | Implemented |
WM0024 # 06 Y:2013 | 06 | 2013 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $827 | $2,009 | Implemented |
WM0024 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $264 | $276 | Not Implemented |
WI0518 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,862 | $7,000 | Not Implemented |
WI0518 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $39,412 | $4,975 | Implemented |
WI0518 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,585 | $11,000 | Not Implemented |
WI0518 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,873 | $0 | Implemented |
WI0518 # 04 Y:2006 | 04 | 2006 | INSTALL SET-BACK TIMERS | $4,978 | $1,400 | Not Implemented |
WI0518 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,802 | $1,630 | Not Implemented |
WI0518 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,994 | $2,560 | Implemented |
WI0518 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,722 | $0 | Implemented |
WI0518 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,210 | $778 | Implemented |
WI0518 # 10 Y:2006 | 10 | 2006 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $883 | $0 | Not Implemented |
WI0505 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,774 | $6,289 | Implemented |
WI0505 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $105,600 | $2,700 | Implemented |
WI0505 # 02 Y:2006 | 02 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $38,400 | $1,000 | Not Implemented |
WI0505 # 05 Y:2006 | 05 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,205 | $7,840 | Implemented |