IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,640

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0077 # 08 Y:2011 08 2011 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,717 $900 Not Implemented
IA0467 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $500 Implemented
IA0467 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,322 $500 Not Implemented
IA0467 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $225 $728 Implemented
IA0467 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,873 $5,024 Implemented
IA0467 # 05 Y:2011 05 2011 USE OPTIMUM THICKNESS INSULATION $2,968 $3,893 Not Implemented
MZ0074 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,976 $820 Implemented
MZ0074 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $515 $0 Implemented
MZ0074 # 03 Y:2011 03 2011 REDUCE HEAT GAIN BY WINDOW TINTING $409 $554 Implemented
MZ0074 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,134 $18,500 Implemented
MZ0074 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $81 $170 Implemented
MZ0074 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $110 $0 Implemented
MZ0074 # 07 Y:2011 07 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,840 $0 Implemented
MZ0074 # 08 Y:2011 08 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,230 $1,000 Not Implemented
LE0320 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,024 $2,093 Not Implemented
LE0320 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,159 $1,360 Implemented
LE0320 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,200 $5,076 Not Implemented
LE0320 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $356 $180 Implemented
LE0320 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $9,057 $19,312 Implemented
LE0320 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $6,336 $12,169 Not Implemented
IC0184 # 01 Y:2011 01 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $265,693 $277,838 Not Implemented
IC0184 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,671 $21,422 Implemented
IC0184 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,196 $20,077 Implemented
IC0184 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,215 $5,303 Implemented
IC0184 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,121 $3,748 Implemented