IAC Assessment: MZ0069
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2011
Principal Product books
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 1,200,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 8,640
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $586,903 9,409,837 kWh $0.06
Electricity Demand $36,919 18,044 kW-months/year $2.05
Natural Gas $85,452 7,549 MMBtu $11.32
TOTAL ENERGY COSTS $709,274
RECOMMENDED SAVINGS* $535,189 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $158,643
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,000
Cost:
$10,000
$1,000 16,667 - - - - - - - - $1,000
16,667
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,390
Cost:
$4,830
$1,390 22,100 - - - - - - - - $1,390
22,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$87
Cost:
-
$87 1,442 - - - - - - - - $87
1,442
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,586
Cost:
$820
$5,586 88,723 - - - - - - - - $5,586
88,723
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,830
Cost:
$1,000
- - $13,830 6,636 - - - - - - -
-
kWh
$13,830
6,636
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$326
Cost:
-
$326 5,435 - - - - - - - - $326
5,435
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$36,400
Cost:
-
- - - - $36,400 3,215 - - - - -
-
kWh
-
-
kW-months/year
$36,400
3,215
MMBtu
-
-
$
-
-
%
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$630
Cost:
$250
$630 10,512 - - - - - - - - $630
10,512
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$940
Cost:
$2,600
$890 13,804 $50 20 - - - - - - $890
13,804
kWh
$50
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
10: 2.8221 CONSIDER INTERMEDIATE OR ECONOMY SIZE AUTOS / TRUCKS Savings:
$65,000
Cost:
$85,000
- - - - - - $65,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$65,000
-
$
-
-
%
11: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$120,000
Cost:
$150,000
- - - - - - $120,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$120,000
-
$
-
-
%
12: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$25,000
Cost:
$5,000
- - - - - - - - $25,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$25,000
-
%
13: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$35,000
Cost:
$8,500
- - - - - - $35,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$35,000
-
$
-
-
%
14: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$115,000
Cost:
$12,500
- - - - - - $115,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$115,000
-
$
-
-
%
15: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$115,000
Cost:
$125,000
- - - - - - $115,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$115,000
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$535,189
Cost:
$405,500
$9,909 158,683 $13,880 6,656 $36,400 3,215 $450,000 - $25,000 - $9,909
158,683
kWh
$13,880
6,656
kW-months/year
$36,400
3,215
MMBtu
$450,000
-
$
$25,000
-
%
TOTAL IMPLEMENTED Savings:
$158,643
Cost:
$128,670
$7,193 114,481 $50 20 $36,400 3,215 $115,000 - - - $7,193
114,481
kWh
$50
20
kW-months/year
$36,400
3,215
MMBtu
$115,000
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production