IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

498

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0204 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,475 $1,320 Implemented
MI0204 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,367 $2,550 Implemented
MI0204 # 04 Y:2011 04 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,856 $9,183 Not Implemented
MI0204 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,117 $9,600 Not Implemented
MI0204 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $50 Implemented
MI0204 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,858 $3,943 Not Implemented
MI0204 # 08 Y:2011 08 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,252 $4,571 Not Implemented
UF0437 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,679 $4,000 Not Implemented
UF0437 # 02 Y:2010 02 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,263 $4,600 Not Implemented
UF0437 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,562 $5,039 Not Implemented
UF0437 # 04 Y:2010 04 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $457 $0 Not Implemented
UF0437 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,443 $4,200 Not Implemented
UF0437 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,608 $469 Not Implemented
UF0437 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,197 $1,979 Not Implemented
UF0437 # 08 Y:2010 08 2010 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,387 $1,200 Not Implemented
UF0437 # 09 Y:2010 09 2010 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,523 $0 Not Implemented
MI0192 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,080 $32,395 Implemented
MI0192 # 02 Y:2010 02 2010 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $39,832 $41,440 Not Implemented
MI0192 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $37,971 $1,020 Implemented
MI0192 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,844 $1,210 Implemented
MI0192 # 05 Y:2010 05 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,608 $35,500 Not Implemented
MI0192 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,417 $1,020 Implemented
MI0192 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,898 $40 Implemented
MI0192 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,732 $4,531 Not Implemented
MI0192 # 09 Y:2010 09 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,176 $9,650 Implemented