Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,640
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0758 # 02 Y:2003 | 02 | 2003 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $9,072 | $12,000 | Implemented |
GT0758 # 03 Y:2003 | 03 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,895 | $47,736 | n/a |
GT0758 # 04 Y:2003 | 04 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,438 | $31,350 | n/a |
GT0758 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $322 | $0 | Implemented |
GT0758 # 06 Y:2003 | 06 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $28,386 | $12,140 | n/a |
GT0758 # 07 Y:2003 | 07 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,773 | $6,150 | Not Implemented |
GT0758 # 08 Y:2003 | 08 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,420 | $1,850 | Implemented |
LM0057 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $543 | $1,430 | Implemented |
LM0057 # 02 Y:2003 | 02 | 2003 | ADD AREA LIGHTING SWITCHES | $2,375 | $3,580 | Implemented |
LM0057 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $568 | $140 | Implemented |
LM0057 # 04 Y:2003 | 04 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $140,025 | $42,126 | Implemented |
LM0057 # 05 Y:2003 | 05 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $47,858 | $12,520 | Implemented |
SF0255 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,228 | $140 | Implemented |
SF0255 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,649 | $3,715 | Not Implemented |
SF0255 # 03 Y:2003 | 03 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $7,212 | $5,250 | Not Implemented |
SF0255 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,226 | $3,400 | Implemented |
SF0255 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,416 | $13,464 | Not Implemented |
SF0255 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $3,302 | $7,220 | Not Implemented |
SF0255 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $353 | $796 | Implemented |
SF0255 # 08 Y:2003 | 08 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,337 | $587 | Not Implemented |
SF0255 # 09 Y:2003 | 09 | 2003 | OPTIMIZE PLANT POWER FACTOR | $678 | $1,749 | Not Implemented |
UF0316 # 01 Y:2003 | 01 | 2003 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $6,710 | $5,529 | Not Implemented |
UF0316 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,048 | $39,293 | Not Implemented |
UF0316 # 03 Y:2003 | 03 | 2003 | INSTALL SKYLIGHTS | $2,373 | $4,104 | Not Implemented |
UF0316 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,100 | $1,073 | Not Implemented |