IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0050 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $10,314 $19,140 Not Implemented
IP0050 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,348 $5,370 Implemented
IP0050 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,242 $4,203 Implemented
IP0050 # 05 Y:2015 05 2015 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,184 $1,792 Not Implemented
IP0050 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $666 $543 Implemented
IP0050 # 09 Y:2015 09 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,085 $21,918 Not Implemented
IP0050 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,187 $1,400 Implemented
IP0050 # 02 Y:2015 02 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,405 $163 Implemented
IP0050 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,927 $0 Implemented
IP0041 # 07 Y:2015 07 2015 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,476 $340 Not Implemented
IP0041 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $113 $385 Implemented
IP0041 # 10 Y:2015 10 2015 OPTIMIZE PLANT POWER FACTOR $1,104 $5,400 Not Implemented
IP0041 # 09 Y:2015 09 2015 $5,896 $5,317 Not Implemented
IP0041 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,278 $5,296 Implemented
IP0041 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,713 $310 Not Implemented
IP0041 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $10,659 $801 Not Implemented
IP0041 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,828 $665 Not Implemented
IP0041 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,057 $167 Implemented
IP0041 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,360 $0 Not Implemented
IP0041 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,690 $0 Not Implemented
IP0006 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,520 $0 Implemented
IP0006 # 06 Y:2012 06 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,261 $92,692 Implemented
IP0006 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $490 $1,156 Not Implemented
IP0006 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $1,771 $730 Implemented
IP0006 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $980 $0 Implemented