IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0027 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,691 $27,814 Not Implemented
DL0027 # 03 Y:2008 03 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,514 $52,000 Implemented
DL0027 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $8,800 $0 Implemented
UW0014 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,835 $57,573 Implemented
UW0014 # 01 Y:2008 01 2008 USE OPTIMUM THICKNESS INSULATION $118,896 $114,435 Not Implemented
UW0014 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,004 $13,992 Not Implemented
UW0014 # 04 Y:2008 04 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,247 $70,905 Not Implemented
UW0014 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,327 $1,500 Not Implemented
UW0014 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,513 $5,640 Not Implemented
UD0781 # 03 Y:2008 03 2008 USE RADIANT HEATER FOR SPOT HEATING $6,695 $2,100 Not Implemented
UD0781 # 09 Y:2008 09 2008 INSTALL TIMERS AND/OR THERMOSTATS $2,146 $1,068 Implemented
UD0781 # 11 Y:2008 11 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $800 $0 Implemented
UD0781 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $6,559 $9,000 Implemented
UD0781 # 07 Y:2008 07 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $2,508 $5,000 Implemented
UD0781 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $0 Not Implemented
UD0781 # 02 Y:2008 02 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,566 $5,000 Implemented
UD0781 # 08 Y:2008 08 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,162 $2,800 Implemented
UD0781 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $0 Implemented
UD0781 # 10 Y:2008 10 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,794 $0 Implemented
UD0781 # 01 Y:2008 01 2008 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $15,217 $4,000 Not Implemented
LE0269 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,284 $3,500 Implemented
LE0269 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $27,087 $9,000 Not Implemented
LE0269 # 02 Y:2008 02 2008 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $77,672 $600,000 Implemented
LE0269 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,596 $36,313 Not Implemented
LE0269 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,038 $900 Implemented