Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 271 | Newspapers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0828 # 16 Y:2010 | 16 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $52,035 | $62,500 | Not Implemented |
UD0828 # 02 Y:2010 | 02 | 2010 | DISCONNECT BALLASTS | $4,524 | $550 | Not Implemented |
UD0828 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,599 | $2,599 | Not Implemented |
UD0828 # 18 Y:2010 | 18 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,601 | $25 | Not Implemented |
UD0828 # 17 Y:2010 | 17 | 2010 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $15,589 | $35,000 | Not Implemented |
UD0828 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,346 | $12,800 | Not Implemented |
UD0828 # 15 Y:2010 | 15 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $990 | $250 | Not Implemented |
UD0828 # 14 Y:2010 | 14 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,308 | $25 | Not Implemented |
UD0828 # 13 Y:2010 | 13 | 2010 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,653 | $25 | Implemented |
UD0828 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,598 | $500 | Not Implemented |
UD0828 # 06 Y:2010 | 06 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,796 | $62,106 | Implemented |
UD0828 # 04 Y:2010 | 04 | 2010 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $86,333 | $28,000 | Not Implemented |
UD0828 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $2,693 | $2,405 | Not Implemented |
UD0828 # 07 Y:2010 | 07 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,431 | $1,200 | Implemented |
UD0828 # 08 Y:2010 | 08 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,272 | $14,000 | Not Implemented |
UD0828 # 09 Y:2010 | 09 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $6,407 | $2,100 | Not Implemented |
UD0828 # 10 Y:2010 | 10 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,710 | $500 | Implemented |
UD0828 # 12 Y:2010 | 12 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,066 | $5,000 | Not Implemented |
UD0800 # 01 Y:2009 | 01 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $42,596 | $0 | Not Implemented |
UD0800 # 04 Y:2009 | 04 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,047 | $0 | Implemented |
UD0800 # 05 Y:2009 | 05 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,892 | $2,000 | Not Implemented |
UD0800 # 06 Y:2009 | 06 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,306 | $0 | Implemented |
UD0800 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $700 | $4,239 | Implemented |
UD0800 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $444 | $1,000 | Implemented |
UD0800 # 09 Y:2009 | 09 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $330 | $300 | Not Implemented |