IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
SIC 271 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0192 # 05 Y:2010 05 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,608 $35,500 Not Implemented
MI0192 # 09 Y:2010 09 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,176 $9,650 Implemented
MI0192 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,732 $4,531 Not Implemented
MI0192 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,417 $1,020 Implemented
MI0192 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,844 $1,210 Implemented
MI0192 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $37,971 $1,020 Implemented
MI0192 # 02 Y:2010 02 2010 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $39,832 $41,440 Not Implemented
MI0192 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,080 $32,395 Implemented
MI0192 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,898 $40 Implemented
MI0146 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,482 $1,074 Implemented
MI0146 # 01 Y:2007 01 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $127,674 $105,070 Not Implemented
MI0146 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $37,375 $30 Implemented
MI0146 # 04 Y:2007 04 2007 HEAT WATER WITH EXHAUST HEAT $14,461 $1,349 Implemented
MI0146 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,799 $14,700 Not Implemented
MI0146 # 06 Y:2007 06 2007 USE PHOTOCELL CONTROLS $6,838 $770 Not Implemented
MI0146 # 07 Y:2007 07 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,866 $2,373 Not Implemented
MI0146 # 08 Y:2007 08 2007 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,920 $4,160 Not Implemented
UF0383 # 08 Y:2006 08 2006 PAY UTILITY BILLS ON TIME $235 $0 Implemented
UF0383 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,618 $0 Not Implemented
UF0383 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,891 $2,960 Not Implemented
UF0383 # 05 Y:2006 05 2006 ISOLATE HOT OR COLD EQUIPMENT $602 $85 Not Implemented
UF0383 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,149 $1,296 Implemented
UF0383 # 01 Y:2006 01 2006 USE PHOTOCELL CONTROLS $952 $954 Not Implemented
UF0383 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,179 $126 Implemented
UF0383 # 02 Y:2006 02 2006 INSTALL OCCUPANCY SENSORS $3,247 $456 Not Implemented