Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
180
matching recommendationsSIC | 271 | Newspapers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0316 # 08 Y:2003 | 08 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,247 | $0 | Not Implemented |
UF0316 # 09 Y:2003 | 09 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,064 | $5,000 | Implemented |
UF0316 # 10 Y:2003 | 10 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,300 | $41,637 | Implemented |
UF0316 # 11 Y:2003 | 11 | 2003 | OPTIMIZE PLANT POWER FACTOR | $15,362 | $9,000 | Not Implemented |
UF0316 # 12 Y:2003 | 12 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,000 | $0 | Not Implemented |
UF0315 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,085 | $353 | Implemented |
UF0315 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,831 | $4,121 | Implemented |
UF0315 # 03 Y:2003 | 03 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $903 | $3,000 | Not Implemented |
UF0315 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,378 | $0 | Not Implemented |
UF0315 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,039 | $1,906 | Implemented |
UF0315 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $3,905 | $1,281 | Not Implemented |
UF0315 # 07 Y:2003 | 07 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $14,685 | $20,500 | Not Implemented |
UF0315 # 08 Y:2003 | 08 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,301 | $260 | Implemented |
UF0315 # 09 Y:2003 | 09 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,266 | $1,895 | Not Implemented |
UF0312 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,162 | $7,981 | Implemented |
UF0312 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $1,258 | $6,000 | Not Implemented |
UF0312 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,934 | $500 | Not Implemented |
UF0312 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,427 | $20,000 | Implemented |
UF0312 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,400 | $31,277 | Not Implemented |
UF0312 # 06 Y:2002 | 06 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,131 | $1,074 | Implemented |
UF0281 # 01 Y:2001 | 01 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $33,061 | $50,725 | Not Implemented |
UF0281 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,622 | $1,402 | Implemented |
UF0281 # 03 Y:2001 | 03 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,786 | $2,400 | Implemented |
UF0281 # 04 Y:2001 | 04 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $3,709 | $2,520 | Not Implemented |
UF0281 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,886 | $410 | Not Implemented |