IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
SIC 271 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0316 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,247 $0 Not Implemented
UF0316 # 09 Y:2003 09 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,064 $5,000 Implemented
UF0316 # 10 Y:2003 10 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,300 $41,637 Implemented
UF0316 # 11 Y:2003 11 2003 OPTIMIZE PLANT POWER FACTOR $15,362 $9,000 Not Implemented
UF0316 # 12 Y:2003 12 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,000 $0 Not Implemented
UF0315 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,085 $353 Implemented
UF0315 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,831 $4,121 Implemented
UF0315 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $903 $3,000 Not Implemented
UF0315 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,378 $0 Not Implemented
UF0315 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,039 $1,906 Implemented
UF0315 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $3,905 $1,281 Not Implemented
UF0315 # 07 Y:2003 07 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $14,685 $20,500 Not Implemented
UF0315 # 08 Y:2003 08 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,301 $260 Implemented
UF0315 # 09 Y:2003 09 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,266 $1,895 Not Implemented
UF0312 # 01 Y:2002 01 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,162 $7,981 Implemented
UF0312 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $1,258 $6,000 Not Implemented
UF0312 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,934 $500 Not Implemented
UF0312 # 04 Y:2002 04 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,427 $20,000 Implemented
UF0312 # 05 Y:2002 05 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $38,400 $31,277 Not Implemented
UF0312 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,131 $1,074 Implemented
UF0281 # 01 Y:2001 01 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $33,061 $50,725 Not Implemented
UF0281 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,622 $1,402 Implemented
UF0281 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,786 $2,400 Implemented
UF0281 # 04 Y:2001 04 2001 DEVELOP A REPAIR/REPLACE POLICY $3,709 $2,520 Not Implemented
UF0281 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,886 $410 Not Implemented