IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,080

matching recommendations
Reset
SIC 2711 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0130 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $246 $0 Implemented
SF0130 # 07 Y:1997 07 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $234 $610 Implemented
SF0130 # 08 Y:1997 08 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $624 $100 Implemented
SF0130 # 09 Y:1997 09 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $973 $0 Implemented
SF0130 # 10 Y:1997 10 1997 MINIMIZE WATER USAGE $853 $1,962 Implemented
SF0130 # 11 Y:1997 11 1997 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $780 $200 Not Implemented
SF0130 # 12 Y:1997 12 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $39,638 $12,650 Not Implemented
SF0130 # 13 Y:1997 13 1997 MODIFY CURRENT INCENTIVE PROGRAM $8,424 $0 Not Implemented
AS0201 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,343 $35 Not Implemented
AS0201 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,065 $960 Not Implemented
AS0201 # 03 Y:1997 03 1997 USE SYNTHETIC LUBRICANT $2,947 $935 Implemented
AS0201 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,756 $26,277 Not Implemented
AS0201 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,979 $34,500 Not Implemented
AS0201 # 06 Y:1997 06 1997 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $3,153 $1,070 Not Implemented
AS0201 # 07 Y:1997 07 1997 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $46,235 $14,000 Not Implemented
AS0201 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $2,188 $1,500 Not Implemented
AS0201 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $600 Not Implemented
AS0201 # 10 Y:1997 10 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,124 $35,959 Not Implemented
AS0201 # 11 Y:1997 11 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,640 $47,883 Not Implemented
AS0201 # 12 Y:1997 12 1997 ELIMINATE LEAKS IN WATER LINES AND VALVES $830 $200 Implemented
AS0201 # 13 Y:1997 13 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $50,790 $14,000 Not Implemented
AS0201 # 14 Y:1997 14 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $571,000 $750,000 Not Implemented
AS0201 # 15 Y:1997 15 1997 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $2,400 $5,000 Not Implemented
SF0113 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $530 $1,150 Implemented
SF0113 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,828 $1,129 Implemented