IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 2711 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0505 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,774 $6,289 Implemented
WI0505 # 01 Y:2006 01 2006 $105,600 $2,700 Implemented
WI0505 # 04 Y:2006 04 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,380 $3,200 Not Implemented
WI0505 # 02 Y:2006 02 2006 $38,400 $1,000 Not Implemented
WI0505 # 05 Y:2006 05 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,205 $7,840 Implemented
WI0505 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,153 $0 Implemented
WI0426 # 04 Y:2002 04 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,333 $0 Implemented
WI0426 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $243 $1,000 Not Implemented
WI0426 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,916 $150 Implemented
WI0426 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,187 $8,714 Implemented
WI0426 # 01 Y:2002 01 2002 REPLACE CLOTH RAGS WITH PAPER TOWELS $4,113 $0 Not Implemented
WI0426 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $797 $800 Not Implemented
WI0426 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $640 Not Implemented
WI0394 # 01 Y:2001 01 2001 $32,472 $1,611 n/a
WI0394 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,875 $34,038 n/a
WI0394 # 03 Y:2001 03 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,800 $0 n/a
WI0394 # 04 Y:2001 04 2001 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,549 $9,975 n/a
WI0394 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,778 $2,000 n/a
WI0394 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,579 $1,280 n/a
WI0394 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,450 $1,263 n/a
WI0394 # 08 Y:2001 08 2001 RECOVER AND REUSE COOLING WATER $1,183 $5,250 n/a
WI0221 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $640 Implemented
WI0221 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $182 $0 Not Implemented
WI0221 # 07 Y:1994 07 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $138 $500 Implemented
WI0221 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $838 $1,000 Implemented