Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2001 |
Principal Product | Commercial Newspapers |
NAICS | n/a |
SIC | 2711 - Newspapers |
Sales | $50,000,000-$100,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 220,000 |
Annual Production | 51,792,000 Pieces |
Production Hrs. Annual | 7,072 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $173,197 | 5,611,928 | kWh | $0.03 |
Electricity Demand | $123,761 | 14,151 | kW-months/year | $8.75 |
Electricity Fees | $23,131 | - | $ | - |
Natural Gas | $25,686 | 5,115 | MMBtu | $5.02 |
TOTAL ENERGY COSTS | $170,690 | |||
RECOMMENDED SAVINGS* | $56,686 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $32,472 Cost: $1,611 |
- | - | - | - | - | - | - | - | $32,472 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$32,472 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,875 Cost: $34,038 |
$5,789 | 177,578 | $2,086 | 226 | - | - | - | - | - | - |
$5,789 177,578 kWh |
$2,086 226 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $4,800 Cost: - |
- | - | - | - | - | - | $4,800 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$4,800 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF |
Savings: $4,549 Cost: $9,975 |
$2,451 | 75,176 | $2,168 | 235 | $(-70) | (-90,000) | - | - | - | - |
$2,451 75,176 kWh |
$2,168 235 kW-months/year |
$(-70) (-90,000) Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,778 Cost: $2,000 |
$1,474 | 45,219 | $1,304 | 141 | - | - | - | - | - | - |
$1,474 45,219 kWh |
$1,304 141 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,579 Cost: $1,280 |
$1,161 | 35,614 | $418 | 45 | - | - | - | - | - | - |
$1,161 35,614 kWh |
$418 45 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,450 Cost: $1,263 |
$676 | 20,722 | $774 | 84 | - | - | - | - | - | - |
$676 20,722 kWh |
$774 84 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $1,183 Cost: $5,250 |
$(-1,291) | (-39,568) | $(-619) | (-67) | $3,093 | 3,959,400 | - | - | - | - |
$(-1,291) (-39,568) kWh |
$(-619) (-67) kW-months/year |
$3,093 3,959,400 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,686 Cost: $55,417 |
$10,260 | 314,741 | $6,131 | 664 | $3,023 | 3,869,400 | $4,800 | - | $32,472 | - | $10,260 314,741 kWh |
$6,131 664 kW-months/year |
$3,023 3,869,400 Tgal |
$4,800 - lb |
$32,472 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes |