IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 273 Books
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0274 # 06 Y:1996 06 1996 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $748 $1,000 Implemented
WI0274 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $905 $700 Implemented
WI0274 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $640 Implemented
WI0274 # 04 Y:1996 04 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,686 $0 Not Implemented
WI0274 # 03 Y:1996 03 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $3,082 $10,500 Implemented
WI0274 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $369 $900 Not Implemented
WI0274 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,613 $1,400 Not Implemented
WI0274 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,100 $0 Not Implemented
BD0036 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,238 $54,640 Implemented
BD0036 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,059 $2,250 Not Implemented
BD0036 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,102 $6,784 Implemented
BD0036 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $5,009 $825 Implemented
BD0036 # 04 Y:1995 04 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,847 $5,000 Not Implemented
BD0036 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,970 $1,575 Implemented
BD0036 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $23,437 $12,950 Implemented
WI0223 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $640 Not Implemented
WI0223 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $816 $0 Implemented
WI0223 # 04 Y:1994 04 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,910 $0 Implemented
WI0223 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $228 $225 Not Implemented
WI0223 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,412 $2,989 Not Implemented
WI0223 # 01 Y:1994 01 1994 REPLACE BOILER $3,696 $6,500 Not Implemented
WI0157 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,838 $3,915 Not Implemented
WI0157 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $600 $640 Not Implemented
WI0157 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,537 $1,300 Not Implemented
WI0157 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $7 Not Implemented