IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

361

matching recommendations
Reset
SIC 273 Books
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0234 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $300 Implemented
WI0223 # 01 Y:1994 01 1994 REPLACE BOILER $3,696 $6,500 Not Implemented
WI0223 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,412 $2,989 Not Implemented
WI0223 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $228 $225 Not Implemented
WI0223 # 04 Y:1994 04 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,910 $0 Implemented
WI0223 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $816 $0 Implemented
WI0223 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $640 Not Implemented
TN0534 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,495 $9,920 Implemented
TN0534 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $2,466 $1,200 Not Implemented
TN0534 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,161 $0 Implemented
TN0534 # 04 Y:1994 04 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $0 Not Implemented
TN0534 # 05 Y:1994 05 1994 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $537 $0 Implemented
TN0534 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $482 $367 Implemented
TN0534 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $427 $860 Implemented
TN0534 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $240 Not Implemented
TN0534 # 09 Y:1994 09 1994 INSULATE BARE EQUIPMENT $179 $220 Implemented
TN0534 # 10 Y:1994 10 1994 REDUCE SCRAP PRODUCTION $45,069 $91,600 Not Implemented
TN0534 # 11 Y:1994 11 1994 USE LESS WASTEFUL PACKAGING $21,100 $34,000 Not Implemented
TN0534 # 12 Y:1994 12 1994 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $19,372 $10,640 Not Implemented
TN0534 # 13 Y:1994 13 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,956 $13,600 Not Implemented
MA0305 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $18,419 $10,078 Not Implemented
MA0305 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,978 $14,015 Not Implemented
MA0305 # 03 Y:1994 03 1994 SHADE WINDOWS FROM SUMMER SUN $15,022 $41,394 Not Implemented
MA0305 # 04 Y:1994 04 1994 USE RADIANT HEATER FOR SPOT HEATING $1,508 $5,569 Not Implemented
MA0305 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $698 $0 Implemented