IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

361

matching recommendations
Reset
SIC 273 Books
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0252 # 10 Y:1988 10 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $147 $0 Not Implemented
KU0252 # 11 Y:1988 11 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $137 $0 Implemented
KU0252 # 12 Y:1988 12 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,191 $0 Implemented
KU0244 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,442 $9,509 Implemented
KU0244 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,665 $0 Implemented
KU0244 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,434 $2,355 Not Implemented
KU0244 # 04 Y:1988 04 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,359 $2,400 Implemented
KU0244 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $404 $125 Implemented
KU0244 # 06 Y:1988 06 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $324 $0 Implemented
KU0244 # 07 Y:1988 07 1988 INSTALL AUTOMATIC STACK DAMPER $178 $275 Implemented
KU0244 # 08 Y:1988 08 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $174 $10 Not Implemented
KU0244 # 09 Y:1988 09 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $114 $0 Implemented
GT0336 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,025 $19,500 Implemented
GT0336 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $228 Not Implemented
GT0336 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,130 $0 Implemented
GT0336 # 04 Y:1988 04 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,790 $1,600 Not Implemented
GT0336 # 05 Y:1988 05 1988 REDESIGN PROCESS $2,610 $2,100 Implemented
CO0104 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $168 $135 Implemented
CO0104 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $1,635 $320 Implemented
CO0104 # 03 Y:1987 03 1987 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,400 $250 Implemented
CO0104 # 04 Y:1987 04 1987 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,064 $10,000 Implemented
CO0104 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,519 $506 Implemented
KU0239 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $5,811 $300 Implemented
KU0239 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $516 $0 Not Implemented
KU0239 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $392 $0 Implemented