IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 273 Books
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0137 # 05 Y:1996 05 1996 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $50,000 $25,000 Implemented
HO0137 # 04 Y:1996 04 1996 USE FLUE GAS RECUPERATION TO REDUCE VOC $500,000 $2,000 Implemented
HO0137 # 03 Y:1996 03 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,210 $2,997 Implemented
HO0137 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $724 $610 Implemented
HO0137 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,704 $2,559 Implemented
WI0274 # 03 Y:1996 03 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $3,082 $10,500 Implemented
WI0274 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $640 Implemented
WI0274 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $369 $900 Not Implemented
WI0274 # 06 Y:1996 06 1996 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $748 $1,000 Implemented
WI0274 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $905 $700 Implemented
WI0274 # 04 Y:1996 04 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,686 $0 Not Implemented
WI0274 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,613 $1,400 Not Implemented
WI0274 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,100 $0 Not Implemented
MO0173 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $2,271 Implemented
MO0173 # 09 Y:1996 09 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,155 $0 Implemented
MO0173 # 08 Y:1996 08 1996 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $267 $120 Implemented
MO0173 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,688 $112 Implemented
MO0173 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,473 $80 Implemented
MO0173 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,663 $9,284 Implemented
MO0173 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $751 $0 Implemented
MO0173 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $173 $0 Implemented
MO0173 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,706 $11,112 Implemented