IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
SIC 2732 Book Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0483 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,305 $5,000 n/a
UM0483 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,643 $3,700 n/a
UM0483 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,638 $2,500 n/a
UM0483 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $860 $1,650 n/a
WM0090 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,362 $1,245 Implemented
WM0090 # 05 Y:2016 05 2016 USE PHOTOCELL CONTROLS $1,577 $1,120 Not Implemented
WM0090 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,717 $1,245 Not Implemented
WM0090 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $1,988 $1,575 Not Implemented
WM0090 # 01 Y:2016 01 2016 INCREASE USE OF AUTOMATION $76,500 $6,500 Not Implemented
WV0519 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $9,710 $691 Implemented
WV0519 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $49,713 $8,500 Not Implemented
WV0519 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,974 $333 Implemented
WV0519 # 11 Y:2016 11 2016 INSULATE BARE EQUIPMENT $247 $439 Not Implemented
WV0519 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,228 $0 Implemented
WV0519 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,944 $155 Implemented
WV0519 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,404 $4,258 Implemented
WV0519 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,274 $33,606 Implemented
WV0519 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $161,462 $330,000 Implemented
WV0519 # 04 Y:2016 04 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $45,119 $1,000 Implemented
WV0519 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,853 $50,000 Implemented
DL0148 # 04 Y:2015 04 2015 REDUCE VENTILATION AIR $7,060 $5,680 Not Implemented
DL0148 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $11,110 $21,440 Not Implemented
DL0148 # 07 Y:2015 07 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,630 $31,200 Not Implemented
DL0148 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678,100 $3,234,220 Implemented
DL0148 # 06 Y:2015 06 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $154,200 $348,840 Not Implemented