IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
SIC 2732 Book Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0116 # 05 Y:1995 05 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $75,971 $0 Not Implemented
UF0116 # 06 Y:1995 06 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $50,619 $1,000,000 Not Implemented
UF0116 # 07 Y:1995 07 1995 USE EVAPORATION TO CONCENTRATE MATERIAL $15,571 $4,450 Not Implemented
UF0116 # 08 Y:1995 08 1995 USE OTHER WASTE CONCENTRATION METHODS $447 $4,450 Not Implemented
UD0406 # 01 Y:1993 01 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $44,100 $50,000 Implemented
UD0406 # 02 Y:1993 02 1993 UPGRADE CONTROLS ON COMPRESSORS $5,101 $3,000 Not Implemented
UD0406 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,502 $8,300 Not Implemented
UD0406 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $1,574 $400 Not Implemented
UD0370 # 01 Y:1992 01 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,775 $7,000 Not Implemented
UD0370 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,993 $500 Implemented
UD0370 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,643 $0 Not Implemented
UD0370 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $767 $500 Implemented
CO0166 # 01 Y:1989 01 1989 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,860 $250 Implemented
CO0166 # 02 Y:1989 02 1989 OPTIMIZE PLANT POWER FACTOR $3,760 $3,900 Implemented
CO0166 # 03 Y:1989 03 1989 INSTALL AUTOMATIC STACK DAMPER $2,050 $4,000 Implemented
CO0166 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $4,130 Not Implemented
CO0166 # 05 Y:1989 05 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $800 $600 Implemented
CO0166 # 06 Y:1989 06 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $440 $200 Not Implemented
CO0166 # 07 Y:1989 07 1989 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $430 $100 Implemented
GT0336 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,025 $19,500 Implemented
GT0336 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $228 Not Implemented
GT0336 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,130 $0 Implemented
GT0336 # 04 Y:1988 04 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,790 $1,600 Not Implemented
GT0336 # 05 Y:1988 05 1988 REDESIGN PROCESS $2,610 $2,100 Implemented
CO0104 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $168 $135 Implemented