IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
Reset
SIC 274 Miscellaneous Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0053 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,830 $21,939 Not Implemented
UW0053 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,673 $11,000 Implemented
UW0053 # 05 Y:2011 05 2011 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $3,594 $3,150 Not Implemented
UW0053 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,936 $1,900 Implemented
UW0053 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,663 $160,551 Implemented
CO0629 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,330 $1,540 Not Implemented
CO0629 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $1,450 Not Implemented
CO0629 # 06 Y:2009 06 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,260 $3,500 Not Implemented
CO0629 # 05 Y:2009 05 2009 ADD AREA LIGHTING SWITCHES $1,530 $320 Not Implemented
CO0629 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $1,940 $1,400 Not Implemented
CO0629 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,160 $1,690 Not Implemented
CO0629 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,070 $9,190 Not Implemented
CO0530 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,370 $230 Implemented
CO0530 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $2,940 $280 Implemented
CO0530 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,070 $7,760 Implemented
CO0530 # 07 Y:2003 07 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $1,200 $570 Not Implemented
CO0530 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,810 $1,250 Implemented
CO0530 # 08 Y:2003 08 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,089,000 $4,200,000 Not Implemented
CO0530 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,830 $4,140 Not Implemented
CO0530 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,370 $10,000 Implemented
SD0329 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $1,360 $1,000 Not Implemented
SD0329 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,418 $380 Implemented
SD0329 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,850 $15,600 Not Implemented
SD0329 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,587 $320 Not Implemented
SD0329 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,811 $6,912 Not Implemented