IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
SIC 274 Miscellaneous Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0530 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,370 $230 Implemented
CO0530 # 08 Y:2003 08 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,089,000 $4,200,000 Not Implemented
CO0530 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,810 $1,250 Implemented
CO0530 # 07 Y:2003 07 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $1,200 $570 Not Implemented
CO0530 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,070 $7,760 Implemented
CO0530 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $2,940 $280 Implemented
CO0530 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,830 $4,140 Not Implemented
CO0530 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,370 $10,000 Implemented
SD0329 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $1,360 $1,000 Not Implemented
SD0329 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,850 $15,600 Not Implemented
SD0329 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,587 $320 Not Implemented
SD0329 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,418 $380 Implemented
SD0329 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,811 $6,912 Not Implemented
MA0514 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $214 $262 Not Implemented
MA0514 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $40,968 $200,000 Not Implemented
MA0514 # 07 Y:2002 07 2002 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $519 $900 Not Implemented
MA0514 # 09 Y:2002 09 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $177 $281 Implemented
MA0514 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,214 $500 Implemented
MA0514 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,407 $0 Not Implemented
MA0514 # 04 Y:2002 04 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,569 $0 Implemented
MA0514 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,892 $0 Implemented
MA0514 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,996 $5,000 Not Implemented
CO0425 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,899 $32,885 Not Implemented
CO0425 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $308 $602 Implemented
CO0425 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,760 $370 Implemented