Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,451
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1075 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,038 | $7,596 | Implemented |
UD1075 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $829 | $0 | Implemented |
UD1075 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,737 | $952 | Implemented |
UD1075 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,565 | $2,238 | Implemented |
UD1075 # 05 Y:2024 | 05 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $712 | $0 | Implemented |
UD1075 # 07 Y:2024 | 07 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $712,662 | $195,000 | Implemented |
MI0426 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,177 | $1,660 | Implemented |
MI0426 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $31,593 | $0 | Implemented |
MI0426 # 03 Y:2023 | 03 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $11,974 | $0 | Implemented |
MI0426 # 07 Y:2023 | 07 | 2023 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $3,449 | $1,600 | Implemented |
MI0426 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,404 | $630 | Implemented |
MZ0342 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $570 | $120 | Implemented |
MZ0342 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,266 | $5,828 | Implemented |
MZ0342 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $5,030 | $3,700 | Implemented |
SD0634 # 06 Y:2023 | 06 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,780 | $11,100 | Implemented |
SD0634 # 03 Y:2023 | 03 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,222 | $2,580 | Implemented |
SD0634 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $942 | $3,568 | Implemented |
SD0634 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,771 | $108,198 | Implemented |
SD0634 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,518 | $700 | Implemented |
SD0634 # 04 Y:2023 | 04 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,998 | $15,050 | Implemented |
SD0634 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $585 | $250 | Implemented |
MI0419 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,550 | $2,325 | Implemented |
MI0419 # 02 Y:2023 | 02 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $19,853 | $37,026 | Implemented |
MI0419 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,061 | $1,060 | Implemented |
MI0419 # 03 Y:2023 | 03 | 2023 | PAY UTILITY BILLS ON TIME | $15,232 | $0 | Implemented |