IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,451

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0520 # 02 Y:2002 02 2002 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $2,161 $2,000 Implemented
MA0520 # 03 Y:2002 03 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,389 $500 Implemented
MA0520 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $45 $0 Implemented
AS0324 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,806 $9,004 Implemented
AS0324 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,673 $0 Implemented
UM0208 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,164 $650 Implemented
UM0208 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,036 $10,015 Implemented
UM0208 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,158 $100 Implemented
UM0208 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $484 $150 Implemented
OK0629 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $947 $308 Implemented
OK0629 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,735 $180 Implemented
OK0629 # 04 Y:2001 04 2001 AIR CONDITION ONLY SPACE NECESSARY $4,536 $400 Implemented
AM0404 # 01 Y:2001 01 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $198,000 $25,000 Implemented
AM0404 # 02 Y:2001 02 2001 REUSE RAGS UNTIL COMPLETELY SOILED $12,600 $0 Implemented
AM0404 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,330 $41,800 Implemented
AM0404 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,800 $2,828 Implemented
AM0404 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,710 $368 Implemented
AM0404 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $250 $0 Implemented
AM0404 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $765 Implemented
LE0125 # 02 Y:2001 02 2001 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,926 $0 Implemented
LE0125 # 05 Y:2001 05 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $466 $0 Implemented
LE0125 # 07 Y:2001 07 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,370 $0 Implemented
UU0013 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $457 $2,636 Implemented
UU0013 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $317 $500 Implemented
MI0015 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,216 $1,000 Implemented