IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,451

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0013 # 08 Y:1985 08 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,042 $42 Implemented
ST0010 # 02 Y:1984 02 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,173 $0 Implemented
ST0010 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,071 $429 Implemented
ST0010 # 04 Y:1984 04 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $930 $0 Implemented
ST0010 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,423 $74 Implemented
ST0010 # 09 Y:1984 09 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $150 Implemented
ST0010 # 11 Y:1984 11 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $910 $537 Implemented
ST0010 # 13 Y:1984 13 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $342 $32 Implemented
KU0146 # 02 Y:1984 02 1984 USE OPTIMUM THICKNESS INSULATION $8,162 $450 Implemented
KU0146 # 07 Y:1984 07 1984 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,653 $75 Implemented
KU0146 # 08 Y:1984 08 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,085 $12,000 Implemented
KU0146 # 10 Y:1984 10 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $345 $137 Implemented
KU0146 # 11 Y:1984 11 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $25 Implemented
KU0146 # 12 Y:1984 12 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $275 Implemented
KU0146 # 13 Y:1984 13 1984 INSTALL TIMERS AND/OR THERMOSTATS $10,168 $5,000 Implemented
KU0146 # 15 Y:1984 15 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $215 $0 Implemented
KU0146 # 16 Y:1984 16 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $4,120 $0 Implemented
KU0146 # 17 Y:1984 17 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $153 $150 Implemented
KU0146 # 18 Y:1984 18 1984 INSTALL AUTOMATIC STACK DAMPER $1,822 $1,400 Implemented
KU0146 # 19 Y:1984 19 1984 INSTALL TURBULATORS $1,427 $1,176 Implemented
KU0146 # 20 Y:1984 20 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $428 $0 Implemented
KU0146 # 21 Y:1984 21 1984 INSTALL AUTOMATIC STACK DAMPER $1,821 $1,400 Implemented
KU0146 # 22 Y:1984 22 1984 INSTALL TURBULATORS $1,530 $1,750 Implemented
KU0140 # 18 Y:1984 18 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $108 $30 Implemented
KU0140 # 19 Y:1984 19 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $165 $90 Implemented