IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,301

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0146 # 07 Y:1984 07 1984 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,653 $75 Implemented
KU0146 # 08 Y:1984 08 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,085 $12,000 Implemented
KU0146 # 09 Y:1984 09 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,806 $3,000 Not Implemented
KU0146 # 10 Y:1984 10 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $345 $137 Implemented
KU0146 # 11 Y:1984 11 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $25 Implemented
KU0146 # 12 Y:1984 12 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $275 Implemented
KU0146 # 13 Y:1984 13 1984 INSTALL TIMERS AND/OR THERMOSTATS $10,168 $5,000 Implemented
KU0146 # 14 Y:1984 14 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $109 $0 Not Implemented
KU0146 # 15 Y:1984 15 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $215 $0 Implemented
KU0146 # 16 Y:1984 16 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $4,120 $0 Implemented
KU0146 # 17 Y:1984 17 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $153 $150 Implemented
KU0146 # 18 Y:1984 18 1984 INSTALL AUTOMATIC STACK DAMPER $1,822 $1,400 Implemented
KU0146 # 19 Y:1984 19 1984 INSTALL TURBULATORS $1,427 $1,176 Implemented
KU0146 # 20 Y:1984 20 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $428 $0 Implemented
KU0146 # 21 Y:1984 21 1984 INSTALL AUTOMATIC STACK DAMPER $1,821 $1,400 Implemented
KU0146 # 22 Y:1984 22 1984 INSTALL TURBULATORS $1,530 $1,750 Implemented
KU0140 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,927 $4,258 Not Implemented
KU0140 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $6,149 $577 Not Implemented
KU0140 # 03 Y:1984 03 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,259 $697 Not Implemented
KU0140 # 04 Y:1984 04 1984 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,737 $8,500 Not Implemented
KU0140 # 05 Y:1984 05 1984 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,911 $4,000 Not Implemented
KU0140 # 06 Y:1984 06 1984 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,864 $1,500 Not Implemented
KU0140 # 07 Y:1984 07 1984 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $755 $900 Not Implemented
KU0140 # 08 Y:1984 08 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,879 $20 Not Implemented
KU0140 # 09 Y:1984 09 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,757 $3,000 Not Implemented