IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,301

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0177 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $39,860 $40,000 Not Implemented
LE0442 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,716 $1,000 Implemented
LE0442 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,680 $5,000 Not Implemented
LE0442 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,763 $2,250 Not Implemented
LE0442 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,887 $7,663 Implemented
LE0442 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,108 $5,000 Not Implemented
LE0442 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,186 $5,500 Implemented
LE0442 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $1,800 Implemented
AS0435 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,295 $200 Not Implemented
AS0435 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,087 $5,774 Not Implemented
AS0435 # 03 Y:2017 03 2017 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,510 $60 Not Implemented
AS0435 # 04 Y:2017 04 2017 MINIMIZE WATER USAGE $912 $2,243 Not Implemented
AS0435 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $787 $60 Not Implemented
AS0435 # 06 Y:2017 06 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $780 $325 Not Implemented
CL1701 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,942 $10,000 Implemented
CL1701 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $18,050 $250 Not Implemented
CL1701 # 03 Y:2017 03 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $12,535 $3,650 Implemented
CL1701 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,647 $22,515 Implemented
CL1701 # 05 Y:2017 05 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $5,838 $13,500 Implemented
CL1701 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,382 $6,000 Not Implemented
MI0310 # 05 Y:2017 05 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,210 $2,400 Implemented
MI0310 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,522 $1,660 Implemented
MI0310 # 07 Y:2017 07 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,771 $3,140 Implemented
MI0310 # 08 Y:2017 08 2017 PAY UTILITY BILLS ON TIME $2,996 $0 Implemented
MI0310 # 09 Y:2017 09 2017 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $1,743 $1,756 Implemented