IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0437 # 07 Y:2013 07 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,111 $46,338 Not Implemented
SF0437 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,497 $14,135 Implemented
SF0437 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $354 $1,395 Not Implemented
SF0437 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $425 $729 Implemented
SF0437 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $3,792 $6,796 Implemented
SF0437 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $620 $0 Not Implemented
SF0437 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $911 $0 Implemented
SF0373 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $1,103 $0 Implemented
SF0373 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,700 $3,605 Implemented
SF0373 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $1,227 $1,320 Implemented
SF0373 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $335 $553 Implemented
SF0373 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $765 $1,569 Not Implemented
SF0373 # 06 Y:2009 06 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $402 $906 Implemented
SF0373 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,543 $12,880 Implemented
SF0373 # 08 Y:2009 08 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $32,866 $534,450 Not Implemented
LM0107 # 01 Y:2006 01 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,522 $2,400 Not Implemented
LM0107 # 06 Y:2006 06 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,251 $1,000 Implemented
LM0107 # 05 Y:2006 05 2006 ADOPT IN-HOUSE MATERIAL GENERATION $16,864 $1,000 Implemented
LM0107 # 04 Y:2006 04 2006 DEVELOP STANDARD OPERATING PROCEDURES $178,334 $5,400 Implemented
LM0107 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,219 $2,200 Implemented
LM0107 # 03 Y:2006 03 2006 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $225,208 $12,980 Implemented
LM0057 # 05 Y:2003 05 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $47,858 $12,520 Implemented
LM0057 # 02 Y:2003 02 2003 ADD AREA LIGHTING SWITCHES $2,375 $3,580 Implemented
LM0057 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $140 Implemented
LM0057 # 04 Y:2003 04 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $140,025 $42,126 Implemented