Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,301
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0294 # 07 Y:2005 | 07 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $8,840 | $3,000 | Implemented |
IA0369 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $464 | $51 | Not Implemented |
IA0369 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,156 | $40 | Not Implemented |
IA0369 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,908 | $1,094 | Not Implemented |
IA0369 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,440 | $1,650 | Not Implemented |
IA0369 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $265 | $304 | Not Implemented |
IA0369 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $250 | $349 | Not Implemented |
IA0369 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,035 | $160 | Not Implemented |
IA0369 # 08 Y:2005 | 08 | 2005 | REDUCE SCRAP PRODUCTION | $49,000 | $500 | Not Implemented |
IA0369 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $499,200 | $800,000 | Not Implemented |
IA0369 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,683 | $20,487 | Not Implemented |
IA0369 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,703 | $2,772 | Not Implemented |
IA0369 # 12 Y:2005 | 12 | 2005 | INSTALL OCCUPANCY SENSORS | $809 | $2,233 | Not Implemented |
OK0708 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,172 | $6,087 | Implemented |
OK0708 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,394 | $6,700 | Implemented |
OK0708 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,314 | $1,327 | Implemented |
OK0708 # 04 Y:2005 | 04 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $8,800 | $0 | Not Implemented |
OK0708 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $37,832 | $13,050 | Implemented |
OK0708 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,450 | $26,280 | Implemented |
OK0708 # 07 Y:2005 | 07 | 2005 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $5,070 | $700 | Implemented |
UD0717 # 01 Y:2005 | 01 | 2005 | INCREASE USE OF AUTOMATION | $68,000 | $145,000 | Implemented |
UD0717 # 02 Y:2005 | 02 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $40,398 | $0 | Not Implemented |
UD0717 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,783 | $39,200 | Implemented |
UD0717 # 04 Y:2005 | 04 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $12,702 | $5,400 | Implemented |
UD0717 # 05 Y:2005 | 05 | 2005 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $12,000 | $2,300 | Not Implemented |