IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0420 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,456 Implemented
UD0420 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,897 $3,000 Implemented
UD0420 # 07 Y:1993 07 1993 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $26,098 $0 Not Implemented
UD0410 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $2,250 $2,250 Not Implemented
UD0410 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $0 $0 Not Implemented
UD0410 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,000 $12,000 Implemented
UD0410 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,156 $5,156 Implemented
UD0410 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,462 $22,462 Implemented
UD0410 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $2,630 Not Implemented
UD0410 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $4,650 Not Implemented
UD0394 # 01 Y:1993 01 1993 REPLACE BOILER $1,962 $0 Not Implemented
UD0394 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $334 $300 Not Implemented
UD0394 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,968 $0 Not Implemented
UD0394 # 04 Y:1993 04 1993 ADD AREA LIGHTING SWITCHES $4,244 $2,000 Not Implemented
UD0313 # 01 Y:1990 01 1990 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,744 $20,000 Implemented
UD0313 # 02 Y:1990 02 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $700 Implemented
UD0313 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $240 Not Implemented
UD0313 # 04 Y:1990 04 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,376 $25,000 Implemented
UD0315 # 01 Y:1990 01 1990 INSTALL STORM WINDOWS AND DOORS $12,565 $12,000 Implemented
UD0315 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $50,970 $40,000 Implemented
UD0315 # 03 Y:1990 03 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,180 $70,000 Implemented
UD0315 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,852 $2,800 Implemented
UD0315 # 05 Y:1990 05 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,503 $0 Not Implemented
UD0311 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,733 $2,400 Implemented
UD0311 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $678 $250 Not Implemented