Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1990 |
Principal Product | PLAYING CARDS & GAMES |
NAICS | n/a |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $50,000,000-$100,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 55,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $338,495 | 6,875,733 | kWh | $0.05 |
Natural Gas | $15,741 | 3,550 | MMBtu | $4.43 |
Other Energy | $824,777 | 98,252 | MMBtu | $8.39 |
TOTAL ENERGY COSTS | $1,179,013 | |||
RECOMMENDED SAVINGS* | $101,070 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $98,567 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Energy | Administrative Changes | Electricity Usage | Other Energy | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $12,565 Cost: $12,000 |
- | - | $12,565 | 3,590 | - | - |
- - kWh |
$12,565 3,590 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $50,970 Cost: $40,000 |
- | - | $50,970 | 14,563 | - | - |
- - kWh |
$50,970 14,563 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $33,180 Cost: $70,000 |
$12,730 | 299,238 | - | - | $20,450 | - |
$12,730 299,238 kWh |
- - MMBtu |
$20,450 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,852 Cost: $2,800 |
$1,401 | 38,394 | - | - | $451 | - |
$1,401 38,394 kWh |
- - MMBtu |
$451 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,503 Cost: - |
$3,503 | - | - | - | $(-1,000) | - |
$3,503 - kWh |
- - MMBtu |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $101,070 Cost: $124,800 |
$17,634 | 337,632 | $63,535 | 18,153 | $19,901 | - | $17,634 337,632 kWh |
$63,535 18,153 MMBtu |
$19,901 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $98,567 Cost: $124,800 |
$14,131 | 337,632 | $63,535 | 18,153 | $20,901 | - | $14,131 337,632 kWh |
$63,535 18,153 MMBtu |
$20,901 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Energy | Administrative Changes | Electricity Usage | Other Energy | Administrative Changes |