IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

234

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0182 # 09 Y:1986 09 1986 IMPROVE LUBRICATION PRACTICES $6,002 $4,500 Implemented
KU0162 # 01 Y:1985 01 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,801 $4,838 Not Implemented
KU0162 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $3,684 $782 Not Implemented
KU0162 # 03 Y:1985 03 1985 IMPROVE LUBRICATION PRACTICES $5,315 $2,000 Not Implemented
KU0162 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,058 $3,000 Not Implemented
KU0162 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,210 $4,973 Not Implemented
KU0162 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,763 $47 Not Implemented
KU0162 # 07 Y:1985 07 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,074 $7 Not Implemented
KU0162 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $395 $0 Not Implemented
KU0162 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $405 $700 Not Implemented
KU0162 # 10 Y:1985 10 1985 RECOVER WASTE HEAT FROM EQUIPMENT $594 $500 Not Implemented
KU0162 # 11 Y:1985 11 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $391 $150 Not Implemented
KU0146 # 01 Y:1984 01 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $26,862 $25,000 Not Implemented
KU0146 # 02 Y:1984 02 1984 USE OPTIMUM THICKNESS INSULATION $8,162 $450 Implemented
KU0146 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $1,774 $389 Not Implemented
KU0146 # 04 Y:1984 04 1984 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $540 $600 Not Implemented
KU0146 # 05 Y:1984 05 1984 IMPROVE LUBRICATION PRACTICES $2,306 $1,500 Not Implemented
KU0146 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,336 $10,562 Not Implemented
KU0146 # 07 Y:1984 07 1984 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,653 $75 Implemented
KU0146 # 08 Y:1984 08 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,085 $12,000 Implemented
KU0146 # 09 Y:1984 09 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,806 $3,000 Not Implemented
KU0146 # 10 Y:1984 10 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $345 $137 Implemented
KU0146 # 11 Y:1984 11 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $25 Implemented
KU0146 # 12 Y:1984 12 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $275 Implemented
KU0146 # 13 Y:1984 13 1984 INSTALL TIMERS AND/OR THERMOSTATS $10,168 $5,000 Implemented