Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0467 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,885 | $0 | Not Implemented |
WV0467 # 13 Y:2013 | 13 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $534 | $826 | Not Implemented |
WV0467 # 14 Y:2013 | 14 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $326 | $810 | Not Implemented |
WV0467 # 11 Y:2013 | 11 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,059 | $571 | Implemented |
WV0467 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,815 | $248 | Implemented |
WV0467 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,668 | $16,750 | Not Implemented |
WV0467 # 01 Y:2013 | 01 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $26,386 | $31,000 | Not Implemented |
WV0467 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,844 | $500 | Implemented |
WV0467 # 09 Y:2013 | 09 | 2013 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,986 | $9,400 | Not Implemented |
WV0467 # 04 Y:2013 | 04 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,526 | $21,000 | Not Implemented |
WV0467 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,786 | $2,550 | Implemented |
WV0467 # 08 Y:2013 | 08 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $5,230 | $3,625 | Not Implemented |
WV0467 # 05 Y:2013 | 05 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $9,901 | $1,000 | Implemented |
WV0467 # 12 Y:2013 | 12 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,260 | $45 | Implemented |
NC0293 # 02 Y:2004 | 02 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $4,884 | $6,553 | n/a |
NC0293 # 07 Y:2004 | 07 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $752 | $1,000 | n/a |
NC0293 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,981 | $730 | n/a |
NC0293 # 05 Y:2004 | 05 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,869 | $10,000 | n/a |
NC0293 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,131 | $2,418 | n/a |
NC0293 # 03 Y:2004 | 03 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $3,750 | $5,400 | n/a |
NC0293 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,068 | $23,100 | n/a |
WV0283 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,827 | $5,000 | Not Implemented |
WV0283 # 04 Y:2004 | 04 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,877 | $100,430 | Not Implemented |
WV0283 # 03 Y:2004 | 03 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,964 | $86 | Implemented |
WV0283 # 01 Y:2004 | 01 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $11,512 | $250 | Implemented |