Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0629 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $190 | $0 | Not Implemented |
OK0629 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,735 | $180 | Implemented |
OK0629 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $193,540 | $25,975 | Not Implemented |
OK0629 # 04 Y:2001 | 04 | 2001 | AIR CONDITION ONLY SPACE NECESSARY | $4,536 | $400 | Implemented |
OK0629 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $947 | $308 | Implemented |
OK0629 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $392 | $627 | Not Implemented |
OK0629 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $495 | $374 | Not Implemented |
AM0404 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,710 | $368 | Implemented |
AM0404 # 08 Y:2001 | 08 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $690 | $765 | Implemented |
AM0404 # 07 Y:2001 | 07 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $250 | $0 | Implemented |
AM0404 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,800 | $2,828 | Implemented |
AM0404 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,330 | $41,800 | Implemented |
AM0404 # 03 Y:2001 | 03 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $15,440 | $0 | Not Implemented |
AM0404 # 02 Y:2001 | 02 | 2001 | REUSE RAGS UNTIL COMPLETELY SOILED | $12,600 | $0 | Implemented |
AM0404 # 01 Y:2001 | 01 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $198,000 | $25,000 | Implemented |
LE0125 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,045 | $0 | Not Implemented |
LE0125 # 06 Y:2001 | 06 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,470 | $0 | Not Implemented |
LE0125 # 05 Y:2001 | 05 | 2001 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $466 | $0 | Implemented |
LE0125 # 03 Y:2001 | 03 | 2001 | IMPROVE LUBRICATION PRACTICES | $1,126 | $400 | Not Implemented |
LE0125 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $30,715 | $2,500 | Not Implemented |
LE0125 # 07 Y:2001 | 07 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,370 | $0 | Implemented |
LE0125 # 02 Y:2001 | 02 | 2001 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,926 | $0 | Implemented |
AS0311 # 04 Y:2001 | 04 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $40,872 | $100,000 | Not Implemented |
AS0311 # 05 Y:2001 | 05 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $7,765 | $4,414 | Not Implemented |
AS0311 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $36,000 | $1,078 | Not Implemented |