IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0629 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $190 $0 Not Implemented
OK0629 # 04 Y:2001 04 2001 AIR CONDITION ONLY SPACE NECESSARY $4,536 $400 Implemented
OK0629 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $392 $627 Not Implemented
OK0629 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,735 $180 Implemented
OK0629 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $947 $308 Implemented
OK0629 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $374 Not Implemented
OK0629 # 03 Y:2001 03 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $193,540 $25,975 Not Implemented
AM0404 # 03 Y:2001 03 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $15,440 $0 Not Implemented
AM0404 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $765 Implemented
AM0404 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $250 $0 Implemented
AM0404 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,710 $368 Implemented
AM0404 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,800 $2,828 Implemented
AM0404 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,330 $41,800 Implemented
AM0404 # 02 Y:2001 02 2001 REUSE RAGS UNTIL COMPLETELY SOILED $12,600 $0 Implemented
AM0404 # 01 Y:2001 01 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $198,000 $25,000 Implemented
LE0125 # 02 Y:2001 02 2001 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,926 $0 Implemented
LE0125 # 03 Y:2001 03 2001 IMPROVE LUBRICATION PRACTICES $1,126 $400 Not Implemented
LE0125 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $4,470 $0 Not Implemented
LE0125 # 07 Y:2001 07 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,370 $0 Implemented
LE0125 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,045 $0 Not Implemented
LE0125 # 05 Y:2001 05 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $466 $0 Implemented
LE0125 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,715 $2,500 Not Implemented
AS0311 # 04 Y:2001 04 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $40,872 $100,000 Not Implemented
AS0311 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $7,765 $4,414 Not Implemented
AS0311 # 06 Y:2001 06 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $36,000 $1,078 Not Implemented