IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0052 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,027 $6,000 n/a
UU0052 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $12,731 $22,600 n/a
UU0052 # 09 Y:2003 09 2003 RECOVER AND REUSE WASTE MATERIAL $50 $0 n/a
UU0052 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $392 $594 n/a
UU0052 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,664 $3,366 n/a
UU0052 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,035 $134 n/a
UU0052 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,186 $2,810 n/a
UU0052 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,302 $1,661 n/a
UU0052 # 06 Y:2003 06 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $2,237 $410 n/a
WI0450 # 01 Y:2003 01 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $137,202 $84,000 Not Implemented
WI0450 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,686 $5,767 Not Implemented
WI0450 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,580 $12,500 Not Implemented
WI0450 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,456 $144,540 n/a
WI0450 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $10,369 $22,000 Not Implemented
WI0450 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,604 $7,821 Not Implemented
WI0450 # 07 Y:2003 07 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,800 $0 Not Implemented
AS0356 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $20 Implemented
AS0356 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $939 $68 Implemented
WI0446 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,093 $1,359 Implemented
AS0356 # 03 Y:2003 03 2003 INSTALL SKYLIGHTS $4,122 $10,296 n/a
WI0446 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,528 $500 Implemented
AS0356 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $697 $675 Not Implemented
AS0356 # 08 Y:2003 08 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $39,566 $55,100 n/a
AS0356 # 09 Y:2003 09 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,865 $10,800 n/a
AS0356 # 12 Y:2003 12 2003 CLEAR AND RENT EXISTING SPACE $96,000 $8,340 Implemented