Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0027 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,691 | $27,814 | Not Implemented |
DL0027 # 03 Y:2008 | 03 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,514 | $52,000 | Implemented |
DL0027 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,800 | $0 | Implemented |
UW0014 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $2,327 | $1,500 | Not Implemented |
UW0014 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $40,835 | $57,573 | Implemented |
UW0014 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,513 | $5,640 | Not Implemented |
UW0014 # 01 Y:2008 | 01 | 2008 | USE OPTIMUM THICKNESS INSULATION | $118,896 | $114,435 | Not Implemented |
UW0014 # 04 Y:2008 | 04 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,247 | $70,905 | Not Implemented |
UW0014 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,004 | $13,992 | Not Implemented |
UD0781 # 11 Y:2008 | 11 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $800 | $0 | Implemented |
UD0781 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,285 | $0 | Implemented |
UD0781 # 08 Y:2008 | 08 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,162 | $2,800 | Implemented |
UD0781 # 09 Y:2008 | 09 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $2,146 | $1,068 | Implemented |
UD0781 # 07 Y:2008 | 07 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $2,508 | $5,000 | Implemented |
UD0781 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,285 | $0 | Not Implemented |
UD0781 # 04 Y:2008 | 04 | 2008 | OPTIMIZE PLANT POWER FACTOR | $6,559 | $9,000 | Implemented |
UD0781 # 03 Y:2008 | 03 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $6,695 | $2,100 | Not Implemented |
UD0781 # 02 Y:2008 | 02 | 2008 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $9,566 | $5,000 | Implemented |
UD0781 # 10 Y:2008 | 10 | 2008 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,794 | $0 | Implemented |
UD0781 # 01 Y:2008 | 01 | 2008 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $15,217 | $4,000 | Not Implemented |
LE0269 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,596 | $36,313 | Not Implemented |
LE0269 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,038 | $900 | Implemented |
LE0269 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,284 | $3,500 | Implemented |
LE0269 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $27,087 | $9,000 | Not Implemented |
LE0269 # 02 Y:2008 | 02 | 2008 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $77,672 | $600,000 | Implemented |