IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0201 # 05 Y:2021 05 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,575 $971 Not Implemented
DL0201 # 14 Y:2021 14 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,020 $5,605 Implemented
DL0201 # 13 Y:2021 13 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $870 Implemented
DL0201 # 12 Y:2021 12 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,102 $4,000 Not Implemented
DL0201 # 11 Y:2021 11 2021 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $263 $0 Not Implemented
DL0201 # 10 Y:2021 10 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $129 $18 Not Implemented
DL0201 # 09 Y:2021 09 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $169 $0 Implemented
DL0201 # 08 Y:2021 08 2021 INSTALL SET-BACK TIMERS $1,842 $0 Implemented
DL0201 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $68 $0 Implemented
DL0201 # 06 Y:2021 06 2021 INSTALL TIMERS AND/OR THERMOSTATS $638 $423 Implemented
DL0201 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,065 $0 Implemented
DL0201 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $93 $0 Not Implemented
DL0201 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $500 Implemented
DL0201 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $3,922 $0 Not Implemented
DL0201 # 15 Y:2021 15 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $14,535 $2,912 Implemented
WM0172 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $26,531 $0 Not Implemented
WM0172 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $5,221 Not Implemented
WM0172 # 07 Y:2021 07 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $0 Not Implemented
WM0172 # 06 Y:2021 06 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,076 $6,500 Not Implemented
WM0172 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,809 $0 Not Implemented
WM0172 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,314 $3,500 Not Implemented
WM0172 # 08 Y:2021 08 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $990 $1,000 Not Implemented
WM0172 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,525 $2,725 Not Implemented
UF0569 # 04 Y:2021 04 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,766 $5,229 Implemented
UF0569 # 05 Y:2021 05 2021 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $11,660 $40,000 Not Implemented