IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

822

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0518 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,873 $0 Implemented
WI0518 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,994 $2,560 Implemented
WI0518 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,722 $0 Implemented
WI0518 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,210 $778 Implemented
IA0387 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,927 $15,519 Implemented
IA0387 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,935 $50 Implemented
IA0387 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $500 Implemented
WV0335 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $127,911 $14,450 Implemented
WV0335 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $6,057 $240 Implemented
WV0335 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,865 $1,420 Implemented
WV0335 # 06 Y:2006 06 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,785 $5,803 Implemented
WV0335 # 08 Y:2006 08 2006 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $985 $1,680 Implemented
MA0598 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,748 $1,125 Implemented
MA0598 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,315 $18,065 Implemented
MA0598 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $4,500 $4,314 Implemented
MA0598 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $300 Implemented
BD0294 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,821 $400 Implemented
BD0294 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $599 $263 Implemented
BD0294 # 04 Y:2005 04 2005 $41,600 $22,000 Implemented
BD0294 # 05 Y:2005 05 2005 $40,952 $20,000 Implemented
BD0294 # 06 Y:2005 06 2005 $13,260 $2,000 Implemented
BD0294 # 07 Y:2005 07 2005 $8,840 $3,000 Implemented
OK0708 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,172 $6,087 Implemented
OK0708 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $6,700 Implemented
OK0708 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,314 $1,327 Implemented