Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
822
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0518 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,873 | $0 | Implemented |
WI0518 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,994 | $2,560 | Implemented |
WI0518 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,722 | $0 | Implemented |
WI0518 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,210 | $778 | Implemented |
IA0387 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,927 | $15,519 | Implemented |
IA0387 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,935 | $50 | Implemented |
IA0387 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,664 | $500 | Implemented |
WV0335 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $127,911 | $14,450 | Implemented |
WV0335 # 04 Y:2006 | 04 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $6,057 | $240 | Implemented |
WV0335 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,865 | $1,420 | Implemented |
WV0335 # 06 Y:2006 | 06 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,785 | $5,803 | Implemented |
WV0335 # 08 Y:2006 | 08 | 2006 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $985 | $1,680 | Implemented |
MA0598 # 02 Y:2006 | 02 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,748 | $1,125 | Implemented |
MA0598 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,315 | $18,065 | Implemented |
MA0598 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $4,500 | $4,314 | Implemented |
MA0598 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $405 | $300 | Implemented |
BD0294 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,821 | $400 | Implemented |
BD0294 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $599 | $263 | Implemented |
BD0294 # 04 Y:2005 | 04 | 2005 | INSTALL AUTOMATIC PACKING EQUIPMENT | $41,600 | $22,000 | Implemented |
BD0294 # 05 Y:2005 | 05 | 2005 | EXPAND OPERATIONS INTO UNUSED SPACE | $40,952 | $20,000 | Implemented |
BD0294 # 06 Y:2005 | 06 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $13,260 | $2,000 | Implemented |
BD0294 # 07 Y:2005 | 07 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $8,840 | $3,000 | Implemented |
OK0708 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,172 | $6,087 | Implemented |
OK0708 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,394 | $6,700 | Implemented |
OK0708 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,314 | $1,327 | Implemented |