Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
822
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0173 # 05 Y:1985 | 05 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $777 | $200 | Implemented |
KU0173 # 07 Y:1985 | 07 | 1985 | IMPROVE LUBRICATION PRACTICES | $398 | $350 | Implemented |
KU0173 # 08 Y:1985 | 08 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $272 | $0 | Implemented |
ST0013 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,678 | $56 | Implemented |
ST0013 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,468 | $1,367 | Implemented |
ST0013 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,533 | $700 | Implemented |
ST0013 # 04 Y:1985 | 04 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $766 | $880 | Implemented |
ST0013 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $964 | $0 | Implemented |
ST0013 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,073 | $400 | Implemented |
ST0013 # 07 Y:1985 | 07 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,713 | $178 | Implemented |
ST0013 # 08 Y:1985 | 08 | 1985 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,042 | $42 | Implemented |
ST0010 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,173 | $0 | Implemented |
ST0010 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,071 | $429 | Implemented |
ST0010 # 04 Y:1984 | 04 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $930 | $0 | Implemented |
ST0010 # 06 Y:1984 | 06 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,423 | $74 | Implemented |
ST0010 # 09 Y:1984 | 09 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $228 | $150 | Implemented |
ST0010 # 11 Y:1984 | 11 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $910 | $537 | Implemented |
ST0010 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $342 | $32 | Implemented |
KU0146 # 02 Y:1984 | 02 | 1984 | USE OPTIMUM THICKNESS INSULATION | $8,162 | $450 | Implemented |
KU0146 # 07 Y:1984 | 07 | 1984 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $8,653 | $75 | Implemented |
KU0146 # 08 Y:1984 | 08 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $17,085 | $12,000 | Implemented |
KU0146 # 10 Y:1984 | 10 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $345 | $137 | Implemented |
KU0146 # 11 Y:1984 | 11 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $636 | $25 | Implemented |
KU0146 # 12 Y:1984 | 12 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $200 | $275 | Implemented |
KU0146 # 13 Y:1984 | 13 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $10,168 | $5,000 | Implemented |